←
0

Architecture & Construction

Glazier

Keep people moving · 5 decisions

Level

Clocking on…

Ready?

Glazier — your shift

Measure twice, lift with two, and the location decides the glass. Read what this person needs, then tap the place that sorts it out.

Full screen — no distractions

What does a glazier do?

You fit glass, which is heavy, sharp and unforgiving — and you decide which kind of glass the law requires in each location.

Also called: glass fitter, window installer, glazing technician.

A day looks like

  1. 1You measure the opening twice, because glass cannot be trimmed on site.
  2. 2You lift panes with somebody else and with suction cups, because a dropped pane is a serious injury.
  3. 3You work out which openings are safety-critical locations, and specify accordingly.
  4. 4You refuse to fit annealed glass into a door side panel, however much cheaper it is.

Hardest part

Glass does not forgive a mistake in either direction. Measure it wrong and it is scrap; fit the wrong type low down in a door and somebody's child goes through it.

Best part

A big unit in, plumb, sealed and clean, with a room that is suddenly twice as light.

How you actually become a glazier

  1. At schoolNo qualifications; strength and care matter more than grades.
  2. TrainingGlazing apprenticeship or on-the-job training, plus competent person scheme registration for windows.
  3. How longMonths to fit, a couple of years for structural and specialist glazing.
  4. Your first jobGlazier's mate — carrying, cleaning and learning to read openings.
Glazier's mateGlazierSpecialist / structural glazing installer or supervisor

Frequently asked questions

What is a critical location for glass?
Low-level glazing, glass in or beside doors, and glazing in bathrooms — anywhere someone is likely to collide with it. Building regulations require safety glass in those positions, marked so it can be identified.
What is the difference between toughened and laminated?
Toughened glass is heat-treated so it breaks into small blunt pieces. Laminated glass has a plastic interlayer that holds the fragments together. Both are safety glass; which is appropriate depends on the position.
Why can't glass be cut on site?
Sealed double-glazed units and toughened glass cannot be cut at all — toughening is the last process and cutting it afterwards shatters it. So the measurement has to be right before the order.

More from Architecture & Construction

Plumber

You find the leak, which is almost never where the damp is, and you work out what to turn off before you touch anything.

Site Manager

You run a site where eight different trades all need the same space on the same day, and you are the person who can stop any of them.

Groundworker

You dig the holes and lay the drains everything else depends on, and the two things that can kill you are collapse and what is already buried.

Building Control Inspector

You inspect work at the stages where it can still be seen, and you are the person who fails a pour nobody wants failed.

Structural Engineer

You calculate whether a building will stand up, and you put your name on the answer.

Demolition Supervisor

You take a building down in the reverse order it went up, and the two things that decide whether anybody gets hurt are sequence and asbestos.

Fire Safety Engineer

You design how everybody gets out of a building that is on fire, and how long the building has to hold up while they do.

Retrofit Insulation Installer

You make old houses warm, and the whole skill is doing it without trapping moisture inside the wall.

Architect

You decide what a building is — how it is entered, lit, used and lived in — inside a budget, a site and a set of regulations that all say no.

Quantity Surveyor

You work out what a building will cost before it exists, and then you defend or challenge every change to that number.

Crane Operator

You move several tonnes through the air over people's heads, mostly without being able to see where it is going.

Heat Pump Engineer

You replace a boiler with something that runs at half the temperature, which means you have to redesign how every room in the house gets warm.

Damp & Timber Surveyor

You work out why a wall is wet, which is almost never the reason the last person said, and you are paid by people who sell the cure.

Electrician

You install and test circuits that will be hidden inside walls, and the only thing that ever stands between a fault and a fire is that you tested it properly.

Carpenter

You set out, mark and cut timber to fit a building that is never quite square, and you only get to cut each piece once.

Bricklayer

You build walls to a line, level and plumb, at a speed that decides whether the job makes money — and the line is not a suggestion.

Scaffolder

You build the structure everybody else works from, and you build it while standing on the part you have already built.

Roofer

You keep water out of a building using overlapping pieces and gravity, working on a slope, above everything else.

Plasterer

You put a wet material on a wall and have a fixed number of minutes to make it flat, because it is setting while you work.

Steel Erector

You bolt a building's skeleton together in the air, and the frame is not stable until you have finished making it stable.

Land Surveyor

You establish where everything goes, to millimetres, and every other trade on the site builds off your marks without checking them.

Try a completely different job

Your Cart (0)

Your cart is empty

Browse our shop to find activities your kids will love